Day 233



The laundry room has been sub floor for so long, I might actually miss it.  We are pushing to finish this before the weekend (the next one) and as it ties into the powder room, that area as well.  On a good note, I love the tile we picked out, plus it is super fast laying larger tiles......... so sometimes things go smoothly.............:)

I hope I didn't jinx myself......... :(

Comments

  1. The wine bottle had water in in to temper the thinset. The tiler wasn't drinking. ;)

    ReplyDelete

Post a Comment

Popular Posts